Good AD0-E313 Adobe Campaign Classic Developer Certified Professional dumps are available, which are the best material for you to study the test. AD0-E313 exam is a related test for Adobe Campaign Classic Developer Professional Certification, which demonstrates to the marketplace that you're able to perform a job role using Adobe's leading solutions. Adobe AD0-E313 exam is for Associate consultant, Junior technical consultant, Junior Marketing technology engineer and Junior Campaign deveolper.
Adobe AD0-E313 Exam
Adobe certification AD0-E313 exam information can help you understand the test well.
Certificate level: Certified Professional
Available languages: English
Number of questions: 50
Formats: Multiple choice and multiple select
Duration: 120 minutes
Delivery: Online proctored (requires camera access) or test center proctored
Passing mark: 31/50
Price: $125 USD / $95 USD (India)
Adobe Campaign AD0-E313 Exam Objectives
Adobe Campaign AD0-E313 exam objectives cover the following details.
Section 1: System configuration (27%)
Section 2: Customization (15%)
Section 3: Operational security (9%)
Section 4: Technical workflows (30%)
Section 5: Instance maintenance (4%)
Section 6: Campaign configuration (15%)
Practice Adobe AD0-E313 Exam Dumps
To test all the above Adobe AD0-E313 exam objectives, the new cracked Adobe Campaign Classic Developer Certified Professional AD0-E313 dumps questions are the best preparation material. Share some Adobe certification AD0-E313 exam dumps questions below.
1.From Adobe Campaign, how is a segment defined in another Adobe Experience Cloud solution accessed?
A. Create linked list
B. Create snared audience
C. Create query
D. Create list
Answer: B
2.What would a developer use to trigger one workflow from another?
A. Scheduler activity
B. Option
C. PostEvent method
D. Jump activity
Answer: D
3.The Adobe Campaign developer sets a 'once' frequency scheduling activity tor a workflow. What is the expected workflow behavior?
A. It will run when it is started and the scheduling time is met but will not finish.
B. It will start automatically when scheduling time is met but the workflow will not finish.
C. It will run automatically when the scheduling time is met and finish when all activities are completed.
D. It will run automatically when the scheduling time is met and then finish automatically.
Answer: C